green sitedata center haifa-allee, mainz

We are currently planning a 2-storey data center with integrated office space and an electrical output of around 40 MW.

The development includes a green design of exterior surfaces and façades and requires significant focus on the local environment. A characteristic feature of the façade is an arcade that serves as an escape route, concealed behind high-quality curtain-type greenery.

All necessary service and office rooms, as well as the security and control area, are housed within the one structure. Building services are mainly located in the basement. Re-cooling and other technical equipment is installed next to a technical control center on the open roof area.

The data center is still in the planning stage, a preliminary building application having been made at the end of 2020.